Comprehensive Transportation Planning, Public Transport Planning, Transport Impact Assessment (TIA), Highway Studies, and ITS Planning
Highway Geometric Design, Traffic Diversion Study, Junction Design, Car Park Design, and Bus Terminal Design
Traffic Survey Data Collection and Analysis, Transport Demand Forecasting, Traffic Data Mining, and Travel Behaviour Analysis
Large-Scale Travel Demand Modelling, Junction Evaluation, Traffic Simulation, and Pedestrian Simulation
About Us
LT Intek is a professional consultancy company providing a broad range of transport consultancy services through a team of experienced designers, planners, and engineers. Established in 2013, the company provides transport consultancy services and is also a distributor of TRL software in China. In 2020 LT Intek’s Singapore branch was established, extending its transport consultancy services across the Asia-Pacific region. Members of the technical team have worked in Singapore, China, the Middle East, Europe, Africa, and Southeast Asia, participating in or leading projects involving Transportation Planning, Highway Design, Traffic Simulation, Traffic Diversion, Traffic Data Analysis, and ITS Software Development
News

20 Jun 2022
LT Intek is granted approval as one of the LTA-Registered TIA Consultancy Firms as of 20 June 2022
LTA launches a registration scheme for Transport Impact Assessment (TIA) consultancy firms in Singapore with effect from 20 June 2022. This scheme recognises and registers TIA consultancy firms known to have the capability to produce quality TIAs and maintain high standards. The list of registered TIA consultancy firms is updated whenever there is a change in registration status. Firms that fail to produce quality work will be removed from the list. LT Intek is proud to announce that we have been granted approval and included in the official list of registered consultancy firms since 2022. You may view the full list on the LTA website via the link below.

Typical Projects
Our technical team members have completed a lot of traffic & transportation engineering projects, in which typical projects under LT Intek are listed below.
-
Transport Impact Assessment on the Site and its neighbouring amenities for existing and future traffic condition upon completion of the residential blocks and common green is conducted.
-
Schematic layout of Bijie High-Speed Railway Station was proposed. Traffic simulation was carried out based on forecasted multi-modal traffic flows to evaluate different design schemes.
-
Traffic volumes were collected by RFID devices in comparison with manual counts data at several locations along highways with different speed limts in Shanghai, Harbin, and Jiangyin City in China. A T-test was carried out to determine if there is a significant difference between the means of two groups of data.
CONTACT US
Your feedback is valuable to us, please feel free to leave message below.
-
22 Sin Ming Lane 6 Floor, Midview City
Singapore 573969
-
+65 - 6962 8070
-
admin@ltintek.com